[Construction between the first and second levels]
Louis-Émile Durandelle
Construction of the shafts of the first level
[Construction to the top of the intermediate level]
Elevator machinery
Filling in pier no.2
Forward pier (no. 4) on the Grenelle side, visit of the Society of Architects
Le nouvel Opéra de Paris. Sculpture ornementale. Clef et tympan de la base du vestibule du contrôle
Pier no 1